We are now on to the final mock up of the new engine. Here we just assembly the Titan oil pump to the block. Some grinding was necessary to the oil pan...
.jpg)
A lot of measurements is made during the assembly. Here we check the cam shafts walking distance in the block.
.jpg)
The Cometic MLS head gasket in positon for the first time.
.jpg)
One head is in it´s place, now just attach the the other head to the block.
.jpg)
The block is assembled, now we just wait for a new set of roller lifters and push rods from StrokerMotor in TX. Then we can made the final assemble of the engine, hopefully in 10 days from now...
.jpg)
The engine is now in the chassis waiting for the header, down pipe and pressure pipe mock up. Ferrita Sweden AB, the no:1 Scandinavian stainless exhaust pipe supplier will ship all the necessary parts during the week.
.jpg)
|